Vipom's pumps pumpsDewatering Pumps, EV
pumps
Dewatering Pumps
description drawings technical data

Sectional Drawing, EV
  1. Suction body
  2. Discharge body
  3. Impeller
  4. Body intermediate
  5. Spreader ring
  6. Nut
  7. Shaft
  8. Locking screw
  9. Ball bearing
  10. Protective sleeve
  11. Gland seal
  12. Labyrinth packing ring
  13. Nut
  14. Safety washer
  15. Sliding bearings
  16. Safety ring
  17. Coupling
  18. Key
Sectional Drawing, EV

Copyright © 2002-2010 rgm1.ru&vipom.com
(+359 94) 609 025, (+359 94) 609 020, (+359 2) 971 56 71, (+3592) 971 56 72, (+7 499) 143 89 68, (+7 4862) 45 86 56, (+7 4862) 45 41 60,vipom@vipom.com